The Project lies in the Siwa River located at the Taplejung District of Nepal. The headworks is proposed on the left bank of Siwa river and powerhouse on right bank of Mewa river between elevation of 1629.51 m and 1452 m above mean sea level. The project is about 730 km road distance in North-East of Kathmandu, the capital city of Nepal.
Progress Updates